High-Speed Train Traction Substation TSS01 220KV Cable Connection (24.8 km)
Project Owner
EETC
Product
220 kV XLPE, 1×1200 mm²
Project Duration
8 Months
Scope of work
EPC
Year
2025\2026
Prev
Previous
Cairo West / Imbaba 220k (14.5 km). Cairo West / El-Dokki 66kV (16.5 km)
Next
SAINT CATHERINE 220/22/22KV GIS S/S